Barclays Data Centre
KNUTSFORD
Very much like a rewire. A number of shutdowns occurred.
This was due to that to the fact that Barclays wouldn’t permit you to have more than one UK site shut down simultaneously, a six-week strategy was required to carry out the necessary changeover of power from existing to new, all of which happened on weekend shutdowns when the building could be powered down and worked on safely.