Clayton Hotel
MANCHESTER
The hotel is brand new. Complete LV cable installation from the newly constructed switch room to distribution boards and the plant room situated on the roof of the hotel.
There are 28 stories, therefore cable must be installed from the basement to the roof. In order to reach the plant room.