LIVERPOOL
Complete installation and connection of LV sub-main cables. 3 x 240mm2 SWA cables had to be pulled through the duct work, extending from an external low voltage (LV) panel to the new LV switchgear located inside the building.
LIVERPOOL
Complete installation and connection of LV sub-main cables. 3 x 240mm2 SWA cables had to be pulled through the duct work, extending from an external low voltage (LV) panel to the new LV switchgear located inside the building.