We were contacted to see if we could replace a faulty joint in the ground which was located by Liverpool university engineers and installed some years earlier by another company.
This needed to be done over the Christmas period before the university students came returned.
Not only did JHCS agree to this, but we supplied all the labour and materials at short notice and worked in challenging weather conditions to get the job done on time.
We spiked the existing cable, cut out the old joint and tested it to confirm the fault. Next, we added two straight joints and tested before Liverpool engineers re-energised.