Spirax Sarco
CHELTENHAM
A new engineering building was connected to the outdoor substation by means of three 300mm SWA cables that were inserted via the ductwork.

Spirax Sarco
CHELTENHAM
A new engineering building was connected to the outdoor substation by means of three 300mm SWA cables that were inserted via the ductwork.