Client Testimonials

Radisson RED Hotel, Liverpool

“I couldn’t recommend JH Cabling Services enough. Their team is reliable and always arrives on time, ready to work. They have a very flexible approach, which is crucial in our line of work as the job isn’t always as described. JHCS adapts very well to last-minute changes and consistently works well with our team.

Their professionalism and adaptability make them a top choice for any cabling needs, I would recommend them to any other contractors to use.”

Adam Medway, Managing Director

AC Group Projects Limited

Testimonial

Barclays Command Centre

“JH Cabling Services have successfully completed projects to a high standard varying from small works to complex major projects. They are proactive in their approach to work, supplying labour at short notice, on occasions when the work scope on our projects has been accelerated to the project programmes. JHCS have always endeavoured to deliver to a high standard and a professional service.

JHCS have continued to provide an excellent service and achieve a high standard of workmanship.

We have no hesitation in recommending JHCS to carry out any cable installation work in the future.”

Steve Lee, Director

SPL Electrical Limited

Testimonial

Liverpool University

“I personally would highly endorse JH Cabling Services for the services they recently carried out on behalf of TFM for Liverpool University.

From the initial call, just before the Christmas holiday, John Hayes couldn’t be more supportive in getting these works completed at our client’s premises before the students returned from there Christmas holidays. John even delivered the materials to our office so the works could be carried out on the first day back in the New Year.

The first day back was Tuesday 2nd January 2024, if anyone can remember we had torrential rain on that day and JHCS operatives Danny & Sam, to their credit, were working in extremely difficult working conditions carrying out 2 x 4 core 120mm straight joints without any complaints. There professionalism and attitude was even complimented by our client.

Again, based on this job I wouldn’t hesitate in recommending JHCS and would definitely use their services again.”

Paul Helsby, Operations Director

Taylored Facilities Management LTD

Testimonial

Seashell Trust, Manchester

“Further to the installation of the mains cable being undertaken by JH Cabling Services at Seashell Trust.

A&B and JHCS worked together well and their installation was extremely well managed and controlled. The JHCS team that attended the site were fantastic in working in conjunction with the other trades and all was left clean on a daily basis.

The quality of the installation was excellent and no defects were picked up.

The works undertaken by JHCS were undertaken safely and as per their detailed RAMS. No damage was experienced to the inside finishes, walls etc which is higher risk taking into account the final trades positioning completing their works. 

A positive attitude from the installation team was experienced during their installation. This was the first time I have used JHCS and based on this experience I would certainly be using them again. Well done to JHCS undertaking the above work at the Seashell Trust.”

Brian Hanley, Construction Manager

Willmott Dixon Construction Ltd.

Testimonial

Smurfit Kappa

“I have used JH Cabling Services on the last of my 4 projects, all with great success and on some challenging projects. John and his team are very knowledgeable and there isn’t a situation they cannot get over.

The team always operates with H&S in mind and complies with all requirements. I highly recommend JH Cabling Services for any cable installation/termination works..”

Ryan Dixon, Project manager

H|E|SIMM

Testimonial

Arndale, Manchester

“Dodd Group have been using John and his team since JH Cabling Service’s was established.

They have been involved in a variety of our projects from heavy industrial to complex commercial buildings. We have always found them to be reliable, conscientious and consistent. Delivering what is required each and every time, without fail.”

Projects: Arndale Centre, SODA, Ashworth Hospital & Deyes Academy

Dan Godfrey

Operations Manager (North West)

Dodd Group Ltd

Testimonial

Eden Project, Manchester

“JCHS completed what was a very challenging job logistically with absolute ease, the team are always very professional and never stray away from the strict H&S procedures on site.

The quality of their work is always excellent, there working attitude is refreshing and always work collectively to overcome any obstacles that crop up.

JHCS are always my number one choice, and I would highly recommend to any other contractors.

Jordan Thompson, Contracts Manager

A&B Engineering

Testimonial

Indectron, Gloucester

“JHCS have undertaken our cabling and jointing requirements across various project over many years. Their installation teams are always very professional in their approach and work to the highest safety standards. 

The standard of workmanship is first class, and the on-site management provided are always capable, approachable, and able to solve many issues that present themselves in construction.    

They are one of our most reliable subcontractors and I couldn’t recommend there services highly enough.”

Projects: Star Academy, Indectron, Gryon Data Centre & Dock 5.

Damien Flynn, Director

East-Tec, Electrical Services Ltd