33KV Cable Installation – BESS Site – Bredbury
Home/
JHCS carried out the installation of 6 x 33KVh Single Core Cables over 350 metres each. To link Bredbury BESS site to the National Grid Substation. This required a specialist 5.2 ton drum trailer and telehandler, all operatives were required to have been trained in “Persons Training” delivered by National Grid.