LIVERPOOL
Complete installation and connection of LV sub-main cables. 3 x 240mm2 SWA cables had to be pulled through the duct work, extending from an external low voltage (LV) panel to the new LV switchgear located inside the building.
![](https://jhcs.co.uk/wp-content/uploads/2024/01/Deyes-Academy-1400x756.jpg)
LIVERPOOL
Complete installation and connection of LV sub-main cables. 3 x 240mm2 SWA cables had to be pulled through the duct work, extending from an external low voltage (LV) panel to the new LV switchgear located inside the building.